2024 – ongoing
Project: 115 MW agrivoltaics PV plant execution design – Catania.
Client: LT (the EPC) has many years of experience and consolidated track record in EPC and O&M with more that 500 MW installed and 1,3 GW under O&M. Nadara (the final Client) is a significant player in the renewable energy sector. Formed from the merger of Ventient Energy and Renantis, Nadara is now the largest independent producer of onshore wind energy in Europe. The company owns more than 4,2 GW of installed capacity.
Activities: SunGAP is assisting the Client in identifying the optimal technical solution for building two plants with a total capacity of 115 MW (Sardella and Big Fish) in the province of Catania. Sardella is a plant of 46 MW in a unique plot in the municipality of Belpasso (CT) and Big Fish is one of the biggest Italian plant with a total capacity of 227 MW, divided over 16 field located in the province of Catania and Siracusa, of which we are designing “only” 70 MW. SunGAP is specifically focusing on the executive engineering of the plant. The goal is to meet both regulatory and final client requirements, while maximizing revenue, minimizing construction time, ensuring the highest quality, and establishing a new best practice in the industry.